Comprehensive Integrity Solution for a Subsea Loading Line
High-quality data collection with a free-swimming, bi-directional MFL-equipped solution
ROSEN was contracted by a South American company to provide a solution to inspect two offshore loading pipelines, one 24” pipeline with a length of 16.7 km and the other 36” pipeline of 10.1 km. These unique systems connect onshore storage facilities to two subsea pipeline end manifold’s (PLEM’s), which are connected to a buoy by a flexible hose for the critical task of loading tankers. Due to its position in the pipeline system, this asset was deemed critical since there was no alternative means to import or export the product.
Loading component...
Loading component...
Loading component...
Our solution
Although conventional inspection methods, in combination with subsea traps or tethered UT solutions, could be sufficient for an in-line inspection, it would not obtain the high-quality data requested by the customer. Therefore, ROSEN’s Solution Experts worked closely with the customer to tailor the optimal solution package.